Wipeout Wiki
Sewage Mistreatment Plant

Season 6’s Sewage Mistreatment Plant

The Sewage Mistreatment Plant is an obstacle, used as the first obstacle in the Qualifier during episode 16 of Season 6.

Contestants must run past a set of rotating pipes and a flipper at the end of one beam, climb onto a swinging pipe and ride it to second beam, and make it past a wall that slides out in front of them and attempts to knock them off with a hidden piston.

The only contestant who cleared this obstacle is Jai Cox.